History Summary
Just some of our recent projects.
2007 |
Value |
BRISTOL – TEMPLE BACK – mixed commercial residential development 290no 600mm diameter CFA piles 16m deep |
£250,000 |
WASH GREEN – DERBY – WTW – 41no 800mm diameter contiguous and bearing piles 12m deep. |
£180,000 |
CITY AIRPORT – LONDON – 217no 1020mm diameter 19m deep each over water for airport extension. |
£5,300,000 |
TILBURY – CEMENT PLANT – 750no 1200, 750, 600 and 450mm diameter piles some rotary, some CFA. |
£950,000 |
NORTHWOOD – MOD – 875no 750mm, 600mm and 450mm diameter piles up to 23.5m deep. |
£1,000,000 |
2006 |
Value |
STRATFORD STATION, LONDON E15 – DLR station redevelopment – 93 No 900mm and 750mm CFA piles |
£216,000 |
REGENT STREET, LONDON W1 – commercial/retail development – 218 No rotary piles, mixture of 450mm & 600mm diameter, maximum depth 31 |
£440,000 |
BALTIC PLACE – GATESHEAD – commercial development 1050 & 750mm diameter secant – 62no. piles and 600mm diameter bearing piles – 170no |
£540,000 |
DARTFORD A282 – Road Bridge 142no. x 900mm diameter piles |
£1,000,000 |
M6 – GUARDSMILL – Motorway bridge 144no. 1500mm diameter piles and 1150no 510mm diameter piles. |
£4,500,000 |
2005 |
Value |
GRAY’S INN, LONDON EC1 – commercial development – 175 No 450mm diameter CFA piles, average depth 19m |
£104,000 |
NORTHAMPTON – ground remediation – 4400 No 900mm diameter mix-in-place barrier piles, average depth 10m |
£700,000 |
DUBLIN – FAIRVIEW SIDINGS – rail sidings – 800 No 600mm diameter CFA piles, average depth 20m |
£1,000,000 |
GIBRALTAR – TRADEWINDS DEVELOPMENT – 300 No rotary bored piles mixed 600mm and 750mm diameter, average depth 13m |
£644,000 |
TWICKENHAM – sports stadium – 1465 450mm and 600mm rotary bored piles, average depth 26m |
£2,150,000 |
2004 |
Value |
WESTWAY, HAMMERSMITH – road retaining wall & housing scheme – 127 No 600mm diameter CFA piles 9.0m deep 1980 No 350mm diameter CFA bearing piles up to 23m deep |
£155,000 |
LEWISHAM HOSPITAL – PFI PROJECT – 358 No 600mm diameter CFA piles, average depth 17m |
£274,000 |
AYR – town centre development – 700 No 450mm and 600mm diameter, CFA contiguous piles |
£245,000 |
FINGRINGHOE – new bridge – 39 No 450mm diameter CFA piles, average depth 15m and 35 No 1200mm diameter rotary bored pile, average depth 26m constructed using polymer support fluid |
£230,000 |
WALTON-ON-THAMES – commercial/retail – 1300 No 600mm diameter hard soft secant retaining wall 15m deep, 100 No 600mm diameter contiguous piled retaining wall 24.5m deep, 750 No 600mm diameter bearing piles 21m deep, all CFA pile |
£1,500,000 |